Are You Measuring Your True Cost Per Pound?
Cost per pound is one of the most useful numbers in a laundry. It can also be one of the easiest to get wrong.
For an industrial rental laundry, almost everything eventually comes back to pounds. Pounds washed. Pounds finished. Pounds delivered. Pounds per operator hour.
But if the number you’re dividing by isn’t accurate—or if you’re leaving significant costs out of the equation—your cost-per-pound figure may be telling you a very convincing story that simply isn’t true.
And that can lead to bad decisions about pricing, equipment, staffing, production efficiency and customer profitability.
Start With the Right Pounds
The first question is surprisingly important:
What pounds are you using?
There is a meaningful difference between pounds entering the plant and clean pounds leaving it.
Soiled textiles contain moisture, dirt and other material that doesn’t belong in the finished product. Using soiled weight as the denominator can make a plant appear more efficient than it actually is.
American Laundry News has specifically cautioned laundry operators against relying on soiled pounds for true cost-per-pound calculations. For a for-profit laundry, measuring or accurately estimating the clean weight of goods shipped provides a better connection between the cost incurred and the product that generates revenue.
That doesn’t mean every laundry needs to throw out its existing production measurements. It means everyone needs to understand what the number actually represents.
If one department is reporting pounds washed, another is reporting clean pounds shipped and finance is dividing expenses by a different production number, you’re not measuring one KPI. You’re measuring three different things.
What Belongs in Your Cost-per-Pound Calculation?
A useful starting point is to divide your costs into categories.
1. Direct production labor
This includes the people who actually move the laundry through the plant:
- Soil sorting
- Washing
- Drying
- Finishing
- Folding
- Packing and preparation
But don’t stop at hourly wages.
Benefits, payroll taxes, workers’ compensation and other employment costs can materially change the true cost of labor. Earlier laundry-industry benchmarking work has repeatedly emphasized the importance of including these costs rather than looking only at base wages.
2. Utilities
Water and sewer are obvious. But don’t forget:
- Natural gas
- Electricity
- Steam
- Fuel
- Wastewater charges and surcharges
Water deserves particular attention because it is both an input and an expense on the way out.
EPA guidance notes that washer-extractor efficiency is commonly measured in gallons of water per pound, with typical washer-extractor consumption varying significantly based on equipment, cycle selection and water levels. Large tunnel washers can use substantially less water because of their continuous, counter-flow design.
In other words, gallons per pound isn’t just an environmental metric. It’s a cost metric.
If your plant uses 2 gallons per pound and another process uses 3 gallons, that difference gets multiplied across every pound you process.
3. Chemicals
Chemical cost should be based on actual consumption whenever possible—not simply what you bought last month.
Track usage against production.
A change in dosing, wash formulas, soil levels or rewash rates can change chemical cost per pound without anyone noticing until the monthly invoice arrives.
4. Maintenance and repairs
A machine that is technically running isn’t necessarily running economically.
Include:
- Maintenance labor
- Replacement parts
- Outside service
- Preventive maintenance
- Equipment-related supplies
Maintenance is particularly important when comparing older equipment with newer, more efficient equipment. The purchase price tells you what the equipment costs to acquire. Your cost-per-pound analysis tells you what it costs to operate.
5. Linen and textile replacement
This is one of the costs that can quietly distort profitability.
A uniform, towel, mat or other textile that disappears from circulation doesn’t simply create a replacement expense. Its original purchase cost has to be recovered over the useful life of the item.
Likewise, excessive wear, damage and premature replacement increase the cost of servicing an account.
American Laundry News’ cost-analysis guidance recommends including linen replacement in the overall cost calculation rather than treating it as something separate from the economics of processing laundry.
6. Distribution and transportation
For a rental laundry, the job doesn’t end when the textile leaves the dryer.
Delivery and return costs can include:
- Driver wages and benefits
- Fuel
- Vehicle maintenance
- Insurance
- Tolls
- Vehicle depreciation
- Route-related labor
A plant can have an impressive washing cost per pound and still have unprofitable customers because of what happens after the laundry leaves the building.
7. Overhead
This is where “cost per pound” often becomes “production cost per pound.”
Those aren’t necessarily the same thing.
Depending on how you define your KPI, you may need to allocate:
- Management
- Administrative staff
- Facility costs
- Property taxes
- Insurance
- Equipment depreciation
- Building depreciation
- Office expenses
- Technology
- Training
- Other operating expenses
There isn’t one universally correct formula. The important thing is to define exactly what your number includes and use the same definition consistently.
Older industry benchmarking work separated production costs from distribution, textile replacement and other operating costs for precisely this reason.
Don’t Forget the Rewash
Here’s another place where the math can get interesting.
Suppose your plant processes 100,000 pounds in a week and 3,000 pounds require reprocessing.
If those 3,000 pounds are simply added to your “pounds processed” number, you may make your operation look more productive.
But you actually consumed additional labor, water, chemicals, utilities and equipment time to process those pounds again.
Rewash is therefore both a quality metric and a cost metric.
American Laundry News has noted that the processing cost of stain and rewash goods can be substantially higher than getting the goods through the plant correctly the first time.
That’s why your reporting should make it possible to distinguish between:
Pounds processed successfully the first time
and
Pounds processed because something went wrong the first time.
Those aren’t equivalent pounds.
A Simple Way to Build the Number
Start with a defined period—monthly is usually practical.
Add the costs you have decided belong in your true operating cost:
Labor + Benefits + Utilities + Chemicals + Maintenance + Supplies + Textile Replacement + Distribution + Allocated Overhead = Total Cost
Then divide by your accurately measured clean pounds produced or delivered, depending on what you’re trying to measure.
For example, if your defined operating costs for the month are $450,000 and your plant produces 750,000 clean pounds:
$450,000 ÷ 750,000 pounds = $0.60 per pound
That $0.60 isn’t necessarily good or bad by itself.
That’s the important part.
The real value comes from watching what happens to that number—and understanding why it changes.
Don’t Chase Someone Else’s Number
There are historical laundry-industry benchmarks that can be useful for perspective. For example, American Laundry News published detailed production-cost benchmarks based on data from hundreds of healthcare and hospitality laundry facilities. The published figures separated labor, administration, maintenance, depreciation, chemicals, utilities, distribution and textile costs.
But those numbers are not a universal target for today’s industrial rental laundry.
Equipment has changed. Utility rates vary dramatically. Labor markets are different. Product mixes differ. Route density differs. Automation levels differ.
A better question than “What’s the industry average?” is:
“What is our number, what is driving it, and is it moving in the right direction?”
Break the Number Down Even Further
Your overall cost per pound is useful. But it becomes much more useful when you can see what’s underneath it.
Consider tracking:
- Labor cost per pound
- Water gallons per pound
- Utility cost per pound
- Chemical cost per pound
- Maintenance cost per pound
- Pounds per operator hour
- Rewash percentage
- Textile replacement cost per pound
- Distribution cost per pound
- Cost per pound by plant
- Cost per pound by customer or route
American Laundry News’ recent coverage of cost controls makes the same basic point: operators can learn considerably more by examining cost per pound at different stages of the process and by customer rather than relying solely on one plant-wide number.
That level of detail can reveal problems that a plant-wide average hides.
If the overall cost per pound is increasing, for example, is labor becoming less productive? Are utility costs rising? Is rewash increasing? Is a particular customer generating disproportionate delivery expense? Is production volume falling and causing fixed costs to be spread across fewer pounds?
The answer matters because each problem requires a different solution.
The Real Goal Isn’t a Lower Number
It’s tempting to think the objective is simply to drive cost per pound as low as possible.
It isn’t.
A laundry could cut maintenance, reduce staffing or delay equipment replacement and temporarily make its cost-per-pound number look better.
That doesn’t necessarily make the business healthier.
The goal is efficient, sustainable production of quality goods at a cost that supports profitable service.
That’s why cost per pound works best alongside other operational measurements.
Look at it with:
Pounds per operator hour.
Rewash percentage.
Water usage per pound.
Equipment utilization.
On-time production.
Textile replacement.
Customer profitability.
Together, these numbers tell a much more complete story.
When Was the Last Time You Rebuilt Your Number?
If you haven’t reviewed your cost-per-pound calculation recently, it may be worth starting from scratch.
Not because the number you have is necessarily wrong.
But because your operation has probably changed.
Wages changed. Utility rates changed. Equipment changed. Production volumes changed. Customer mix changed. Routes changed. Textile costs changed.
The formula that worked five years ago may not tell you everything you need to know today.
And if you’re making decisions about pricing, equipment, automation, staffing or customer profitability, knowing your true cost per pound isn’t just accounting—it is operational intelligence.
The better you understand what it costs to produce every pound, the better positioned you are to decide where your laundry can become more efficient, where costs are creeping in and where the next improvement opportunity is hiding.
Sources
- American Laundry News, “Examining Cost Controls in Laundry & Linen Services (Part 1)”, April 23, 2024.
- American Laundry News, “Examining Cost Controls in Laundry & Linen Services (Conclusion)”, April 25, 2024.
- American Laundry News, “Measuring Cost Per Pound? Include All Expenses (Part 1 of 3)”.
- U.S. Environmental Protection Agency, WaterSense at Work: Laundry Equipment.
- U.S. Environmental Protection Agency, Pollution Prevention at Industrial Laundries: Assessment Observations and Waste Reduction Options.
- American Laundry News, “Exclusive: 2009-2010 Textile Care Processing Cost Benchmarks.”